Main Street Bridge Replacement

Discipline
Architecture
Date
2006
Work Type
Images
photographer
McAllister, Lorrie
architect
DLZ
Description
The Main Street Bridge replacement construction began in 2006 and was completed in 2009. The new bridge will feature a single-rib tied arch with a 400-foot span that will carry separate vehicle and pedestrian lanes. The arch will be inclined at a 10-degree angle from vertical, adding to the uniqueness of the signature structure. A pedestrian deck will sweep horizontally and vertically away from the roadway to provide an unobstructed view of the city's downtown.